Currently, Seqera Studio requires users to set a session lifespan at the time of creation, and this cannot be changed once the session is running. This limitation can lead to inefficiencies when workflows take longer than expected or finish earlier than planned.
It would be good to add functionality to adjust the session stop time (extend or shorten) for an active session without restarting it. This would allow users to:
- Extend sessions when additional compute time is needed.
- Shorten sessions to save resources if work completes early.
Benefits:
- Improved flexibility for dynamic workloads
- Reduced resource waste and cost
- Better user experience for long-running or unpredictable tasks

Rob Newman
updated the status to
closed

Rob Newman
Visiting Bear: When a Studio session is within 15 minutes of it's end time, an "Extend session" button appears in both the session list-view and detail view, and also in the active Studio session as a modal window requesting that the connected user either extend or ignore extending the session for an additional session lifespan.
Shortening sessions is not available because you can just stop the running Studio.
Does this resolve your need?
V
Visiting Bear
Rob Newman: Hi Rob,
Thanks for looking into it.
Unfortunately, this doesn't fully resolve the need.
In our workspace, Studio sessions are intentionally limited to 8 hours by default to prevent sessions from being left running overnight or over weekends/holidays when they are no longer being used. However, there are situations where a session is actively performing a long-running computation and needs to continue beyond the original timeout.
The challenge is that these jobs often run overnight or unattended, so there is no user available to respond to the extension prompt during the final 15 minutes of the session. As a result, the session can terminate even though the work is still ongoing and expected to continue.
What I'm proposing is the ability for a user (without administrator rights) to modify the stop time of an already running session at any point during its lifetime, not only within the final 15 minutes. This would allow users to start with a conservative default timeout for safety, and then later extend the session when they know a particular workload requires additional runtime.
For example, in the current Studio UI, I have the following actions available for a running session:
View SSH details
Stop
Connect
and I can see:
Session stop time: 2026-11-18 13:12:38
What I would like to see is an additional "Extend session stop time" button that allows the user to increase the stop time of an active session. The extension could still respect administrator-defined limits, for example a maximum session extension of 20 hours. This would give users flexibility when a session is running a legitimate long-running workload, while preserving the existing safeguards that prevent sessions from being accidentally left running indefinitely.
I think this would complement the existing "Extend session" functionality and provide more flexibility for unattended or unpredictable workloads.
Thanks!

Andrew Dawson